3 家媒体·3 篇报道·历时 25h
NASA says it needs to haul the Artemis II rocket back to the hangar for repairs
NASA has delayed the crewed Artemis II lunar mission because a helium-flow interruption was discovered in the Space Launch System’s upper stage. The rocket is being rolled back to the Vehicle Assembly Building for repairs, and the launch window has been moved from early March to April while the problem is addressed.
本文综合以下全部报道写成,而非依据任何单一来源。